View Transcript
Episode Description
HS2 was conceived at a cost of £37.5 billion and originally supposed to link London, Birmingham, Manchester and Leeds. It will now connect only two stations outside London and Birmingham at a projected cost of more than £100 billion, and perhaps won’t even be ‘high speed’. To discuss what this failure tells us about Britain’s capacity to build things and the consequences for our everyday lives, James is joined by Gill Plimmer, the FT's infrastructure correspondent, and Matthew Lawrence, director of Common Wealth. They discuss the unique features of the UK’s ‘outsourcing state’, beset by bloated projects weighed down by the increasing costs of private capital, and the long, corrosive impact of the failure of David Cameron’s government to invest in infrastructure when borrowing was cheap.
Read more on politics in the LRB: https://lrb.me/lrbpolitics
From the LRB
Subscribe to the LRB: https://lrb.me/subslrbpod
Close Readings podcast: https://lrb.me/crlrbpod
LRB Audiobooks: https://lrb.me/audiobookslrbpod
Bags, binders and more at the LRB Store: https://lrb.me/storelrbpod
Get in touch: podcasts@lrb.co.uk
Learn more about your ad choices. Visit megaphone.fm/adchoices