Party Wall Act Explained: What Homeowners Need to Know

July 23
58 mins

Episode Description

Do you know if your renovation actually needs a party wall notice?

Most homeowners assume the Party Wall Act exists to stop them building.

In this episode, we unpack the Party Wall Act with a chartered party wall surveyor, covering exactly which works trigger it, from loft conversions and rear extensions to basement digs and chimney breast removals. We explain the notice periods, the difference between consent and a formal award, and why early, open conversations with neighbours nearly always save time and money.

We also get into the practical traps: building too far from the boundary line, serving notice before planning permission is secured, and letting too many surveyors get involved on a single job. The episode sets out how the award process actually works, who pays for it, and what genuinely causes delays.

Get the process right and the act works in your favour. Get it wrong, and a simple extension can turn into a costly, drawn-out dispute.

"Consent trumps everything" in the party wall process. — Jonny Callard

 

You’ll hear about:

 

See all episodes